Indonesia's indramayu 3x330mw coal-fired power station (8600m2)

Indonesia indramayu 3 x330mw coal-fired power station covers an area of 8600 m2, using the siphon drainage system, in order to control rain water effectively, stopping dangerous of leakage. The roof drain and piping layout is flexible and the non-gradient installation of the hanging pipes would facilitate the full use of the architectural space.

View File